Design, Supply & Installation of Fire WaterPump in Madagascar
PetroTec > Design, Supply & Installation of Fire WaterPump in Madagascar
Design, Supply & Installation of Fire WaterPump in Madagascar
A risk analysis was performed on the biggest terminal in Madagascar, and the final report stated that their actual fire-fighting pump capacity was not sufficient. We re-designed the complete fire fighting layout for 21 tanks in Zone B and 6 tanks in Zone A. A new 12” pipes mesh designed were installed and 72 3”hydrants as well as 2 Motopumps of 500m3 and the respective Jockey pumps.